Τhe Volos Defence Hub

  • 4 factories at maximum capacity and 2 underway
  • Scaling our footprint from 30,000m² to a total of 100,000m² of specialized industrial space.
  • Strategic location in Volos with direct access to critical infrastructure: Port, Rail, Highway, and Airport.

“Expansion of the production capacity of the industrial complex for specialized advanced metal structures in Volos” by Metlen Energy & Metals S.A.

Implementing Body: General Secretariat of Private Investments (GSPI)

The investment is being carried out within the framework of the National Recovery and Resilience Plan “Greece 2.0,” funded by the European Union / NextGenerationEU.

Project budget: €45,000,000

Aid granted: Grant: €18,000,000, Tax Exemption: €4,500,000